Adrian Gac ← Automation use cases
PL Let's talk →
Automation use cases · Made-to-order manufacturing Furniture · metal · packaging · plastics

Automating quotes and orders in made-to-order manufacturing

Every enquiry looks different, and the quote depends on one person's experience. I show how to collect the parameters, ask about missing details and calculate the quote using your rules, and which other processes in the plant can be handed over to automation.

Book a free consultation See use cases ↓
Main scenario

From enquiry to a quote ready for approval

In made-to-order manufacturing, quotes often wait for days because a process engineer prices them between other tasks. Meanwhile, the customer asks other manufacturers.

01 →
Email / form / drawing

Request

The customer sends an enquiry by email or through a form, often with a technical drawing in PDF, a sketch or a photo.

02 →
AI

Collecting parameters

AI extracts dimensions, material, thickness, finish, quantity and deadline, as well as additional requirements such as a RAL colour, printing or packaging method.

03 →
Email

Questions about missing details

When data needed for the quote is missing, the customer immediately receives a short list of questions. The reply completes the enquiry sheet.

04 →
Rules + price lists

Calculation using your rules

Material, machine time, operations, waste, changeovers and margin are calculated using your rules and current material prices.

05
PDF / CRM

Quote for approval

The sales rep or process engineer receives the quote with a cost breakdown, adjusts it if needed and sends it to the customer with one click.

In practice · example scenario

An enquiry for 500 sheet metal enclosures

The customer sends a PDF with an enclosure drawing and writes: “500 pieces, painted black”. The system reads the dimensions and material, but the enquiry lacks the sheet thickness and coating texture, so the customer gets two questions. After the reply, the calculator prices the sheet, laser cutting, bending, powder coating and packaging. The sales rep receives a quote with a cost breakdown and a variant for 1,000 pieces.

More use cases

What else can be automated in made-to-order manufacturing?

01–03

Quotes and orders

The quote is only the beginning. Variants, follow-ups and handing the order over to production can also be prepared automatically.

01

Quantity and material variants in one quote

Today

The customer asks for 500 pieces but would gladly order 1,000 if they knew the price. Preparing several variants means several separate calculations.

After automation

The calculator prices several quantity tiers and material variants at once, e.g. a different board, sheet thickness or type of cardboard. The customer receives one quote with a comparison, and the sales rep sees the margin for each variant.

Parameters → Quantity tiers → Material variants → Quote with comparison
02

Follow-ups on sent quotes

Today

Quotes are sent and then you wait. No one gets back to the customer after a week, and the reason for a lost order remains unknown.

After automation

A few days after the quote is sent, the sales rep receives a reminder, or the customer gets a short message asking about their decision. Lost quotes are tagged with a reason, such as price or lead time, which shows where you are losing orders.

Quote sent → Reminder → Customer reply → Reason for win / loss
03

From an accepted quote to a production order

Today

After a quote is accepted, someone retypes the data into the ERP, creates the order, attaches the drawing and sets the routing. Every retyping is a risk of an error in dimensions or quantity.

After automation

Accepting the quote creates an order in the ERP with the parameters, bill of materials, operations from the calculation and the attached drawing. The process engineer checks it and releases the order to production.

Quote accepted → Order in ERP → Materials and operations → Release to production
04–06

Production and planning

The lead time in the quote should reflect the plant's workload, and the material should be in place before the order reaches the shop floor.

04

A realistic lead time in the quote

Today

The lead time in the quote is given off the top of someone's head. When the shop floor is busy, the date slips, and the customer finds out at the last minute.

After automation

During calculation, the system checks the workload of the machines and workstations needed for the order and the material delivery time, and suggests a realistic date. The sales rep sees which orders are blocking faster delivery.

Operations from the calculation → Machine workload → Material availability → Lead time in the quote
05

Material orders for production orders

Today

Demand for boards, sheet metal, cardboard or granulate is calculated by hand from several orders. Material is ordered too late or with surplus stock that piles up.

After automation

The bill of materials for each order is compared with stock and orders in transit. The system prepares a draft supplier order with a date based on the production plan.

Orders → Bill of materials → Warehouse stock → Draft order
06

Order status for the customer and sales rep

Today

Customers call to ask what stage their order is at. The sales rep walks to the shop floor or calls the shift manager.

After automation

Operators confirm completed operations on a tablet or by scanning the code on the order. The status updates itself, and the customer is informed when production starts, when the order is ready to ship and of any delay.

Operation completed → Order status → Sales rep → Customer notification
07–09

Quality and documentation

Shop floor documents, certificates and complaints rely on data the plant already has in its orders.

07

Cutting lists, labels and shop floor documents

Today

Panel lists, cutting lists and product labels are prepared by hand based on the order. A mistake in one dimension only shows up at assembly.

After automation

Order data generates cutting lists, labels with the order code and packing instructions in the format needed at each workstation. A change to the order updates the documents automatically.

Order → Lists and labels → Workstation → Update on change
08

Certificates, declarations and shipping documents

Today

The customer requires a material certificate, a declaration of conformity or food contact documentation. An employee looks for supplier files and assembles them by hand.

After automation

Supplier documents are linked to the material batch, and the batch to the order. At shipping, the system assembles the required certificates and declarations and sends them to the customer together with the delivery note.

Material batch → Order → Complete document set → Sent to customer
09

Quality complaints

Today

A complaint arrives by email with photos. Establishing which order, material batch and shift the product came from takes a lot of time.

After automation

The customer submits a complaint through a form. The system links it to the order, material batch and operations, opens a case for the quality team and tracks response deadlines.

Complaint form → Order and batch → Quality team → Response on time
10–12

Finance and profitability

A calculation is only as good as the data behind it. KSeF invoices and actual production times let you improve it continuously.

10 KSeF

Advance and final invoices in KSeF

Today

For made-to-order work, an advance payment is often taken. Advance invoices, final invoices and settling advances are issued by hand, and mistakes are easy to make.

After automation

After the quote is accepted, the system issues an advance invoice, and after shipping a final invoice settling the advance. Both go to KSeF in the FA(3) structure and to the customer, and payments are linked to the order.

Quote accepted → Advance invoice → Sending → Final invoice
11 KSeF

Current material prices in the calculator

Today

Prices of boards, steel or granulate change every month, but the calculator uses a price list from last quarter. Quotes go out with a lower margin than it seems.

After automation

Purchase invoices downloaded from KSeF update material prices in the calculator. When a material price rises above a set threshold, sales reps are notified and open quotes with that material are flagged.

KSeF invoices → Material prices → Calculator → Change alert
12

Estimated versus actual cost

Today

After delivery, no one checks whether the order earned as much as the quote assumed. The same pricing errors repeat in later orders.

After automation

After an order is closed, the system compares material usage and operation times with the calculation. Every month, the process engineer receives a list of products and operations with the biggest differences, to improve the pricing rules.

Closed order → Times and usage → Comparison with quote → Rule adjustment
A day after implementation

What does a day at the plant look like after implementation?

An example of a plant that connected its enquiry inbox, calculator, ERP and KSeF. Process engineers and sales reps focus on unusual projects and customers.

7:00

Overnight enquiries have their parameters collected, and customers with missing details have received questions.

Before noon

The sales rep approves quotes calculated using the rules and sends them to customers.

After acceptance

The production order, material requirements and advance invoice are created automatically.

During production

The customer receives the order status and shipping date without calling the office.

Every month

The process engineer receives a comparison of calculated and actual costs and adjusts the rules.

Principles

What principles does the automation follow?

01

The process engineer decides

The automation collects data and calculates using the rules. A person approves the quote, and unusual projects always go to the process engineer.

02

Your rules, not a black box

We write down machine-hour rates, time standards, waste and margins together with your process engineer. Every rule is visible and can be changed.

03

Drawings and prices under control

Customer drawings and commercial terms are not sent to public AI tools. For confidential projects, the model can run on the company's own server.

04

Start with one product group

We start with the products customers ask about most often and add more once pricing proves itself in practice.

FAQ

Frequently asked questions

Will the automation price every product?

Not every one. It works best for repeatable product types, such as furniture panels, sheet metal enclosures, cartons or mouldings from existing tools. For unusual projects, the system collects the data and prepares the enquiry sheet, and the process engineer prices it.

How does the system know our costs?

From rules we write down together with your process engineer: machine-hour rates, operation time standards, waste, changeover costs and material price lists. Material prices update from invoices, and we refine the rules by comparing them with actual costs.

Can AI read a technical drawing?

From a legible PDF drawing, AI reads dimensions, material, tolerances and notes, and shows the results for checking. It does not replace the process engineer for complex geometry, but it saves retyping data into the enquiry sheet.

Where should we start?

With one product group that generates the most enquiries. We write down its pricing rules, test the calculator on quotes from recent months and only then bring it into daily work.

Let's test it on enquiries from your customers.

Book a free 30-minute consultation. Show me a few typical enquiries and how you price them today, and I'll tell you which rules can be automated.

Book a free consultation →
Related services and use cases
Service↗
Process automation Workflows that connect email, the calculator, ERP and KSeF.
Service↗
Web apps Product configurators and portals where customers submit enquiries themselves.
Use cases↗
B2B wholesale and distribution From an order email to a draft order in the ERP.